Logo

ECT PROJECT 10 :
High Efficient Heat Energy Recovery System for Lubricant Oil Blending Plant

Project Description

Design and Supply of one Lubricant Oil Blending Plant complete with one unit of Thermal Oil Heating System of 8.0 MBU/hr, Fuel-oil Fired.

Technology Category

Green Effort

Technology Ownership

Client Owned

Project Value

USD 580.000.00

Scope of Works

To Design, Fabricate, Erect, Test and Commission, and Guarantee;

One system of Lubricant Oil Blending Plant complete with one unit of Thermal Oil Heating System of 8.0 MBU/hr, Fuel-Oil Fired comprising of:

Package diesel fired Thermal Oil Heater comprising of:
• Double helcal coil 3 pass heat generator with auto fuel burner and controls
• Hot oil circulation pump, valves and heat distribution and supply system
• System air deaerator, expansion and drain tanks
• Heat recovery unit for energy conservation

Base oil storage tanks with heating coils c/w spiral ladder of capacities, 40 tons x 3 units, 100 tons x 2 unit

Blending tanks with external semipipe heating jacket, internal helical heating coils and motorized stirrer of capacities, 10 tons x 3 units, 5 tons x 3 units

logo-small-footer