Logo

ECT PROJECT 04 :
Green Energy Generators for Rubber Processing Facilities

Project Description

Design and Supply of package Steam and Thermal-oil Heat Energy Generators complete with the full distribution and heat-transfer plants of piping, pressure reduction, condensate recovery, heat exchangers and process controls for Felda Rubber Industries (the largest Government owned group of companies for palm oil and rubber plantations and products).

Supply period from 1988 to 2006

Technology Category

Green Effort

Technology Ownership

Client Owned

Project Value

USD 12,750.000.00

Scope of Works

To Design, Fabricate, Erect, Test and Commission, and Guarantee;

20 years in the supply of energy and cost efficient turn key plants focusing on the processing of rubber for the glove and tyre industries

1988 –
Conversion and supply of steam heated rubber glove manufacturing system complete with 2 x 5tons/hr boiler, steam distribution system, hot-air/hot-water heat-exchangers, and control system for 4 nos of glove manufacturing lines.

1991-
Supply of steam distribution and heating system to hot-presses for rubber products molding complete with 1 x 4 tons/hr boiler, steam distribution system and control system.

1991/92-
Supply of Turnkey Steam Heating Plant for 6 nos of 60M Glove Processing Plants complete with 2 x 8 tons/hr boiler, steam distribution system, hot-air/hot-water heat-exchangers, and control system.

1994 –
Supply of Turnkey Steam Heating Plant for 10 nos of 100M Glove Processing Plants complete with 6 x 4 tons/hr boiler, steam distribution system, hot-air/hot-water heat-exchangers, and control system.

1999 –
Turnkey Supply of 4 production lines of Glove Manufacturing Plants with Patented High Productivity Duo-Pro II Glove Dipping Systems complete with 2 x 6 tons/hr Steam Heating Plants.

2003/4 –
Turnkey Supply of 2 production lines of Glove Manufacturing Plants with Patented High Productivity Duo-Pro II Glove Dipping Systems complete with 1 x 6 tons/hr Steam Heating Plants.

2006 –
Supply of Fuel Cost Savings 24 MBtu/hr Biomass Heat Generation System to replace Fuel-oil heating system for rubber products plant complete with automatic biomass fuel feeding system of moving-floor bunker, screw-feeder, scraper conveyor feeder and buffer silo temperature controlled intermittent dumper, and smokeless biomass combustion system of dynamic pusher grate and multicyclone flue-gas dust arrestor.

logo-small-footer